Working with millrace

Refund and Cancellation Policy

Refunds depend on the stage a project has reached and the work completed. This policy sets out the payment stages, the production clock, the standard package schedules, the delay credits and what happens when a project is cancelled.

Last updated:

Scope and definitions

This policy applies to accepted concept-to-playable packs, fixing or porting, defined-idea production, direct production and agency batches when identified in the accepted offer. An inquiry or expressly free introductory call creates no paid contract or reserved slot. Mandatory statutory rights prevail.

Terms used here

Calendar day
A consecutive 24-hour period, including weekends.
Business day
Monday–Friday excluding official public holidays in Turkey.
Production hour
One elapsed hour in an active production stage, excluding only notified, documented qualifying pauses under “Production clocks and permitted pauses”.
Confirmed kickoff
The agreed moment the relevant stage starts.
Complete brief
Approved scope and acceptance requirements, required assets, destination URLs, target networks and necessary technical instructions.
Concept
An interactive evaluation prototype, not necessarily finished artwork or network packaging.
Final playable
An agreed tested HTML5 advertisement and its required network-specific outputs.
Delivery and completion
Concept delivery is an unlisted review link. Final delivery is the playable files for your agreed networks. Completion means customer approval without another revision request.
Inactivity
A missing necessary reply, approval, asset or payment after documented request.
Revision
A requested creative adjustment to work that otherwise conforms to the agreed scope.
Correction
Work needed to resolve a reproducible defect or a material mismatch with the agreed scope.
Change order
A separately approved change that affects the scope, budget, resources or delivery schedule.
Acceptance
Written confirmation that a specific deliverable meets the agreed requirements.
Agency customer
The contracting advertising agency, which may represent its own end client.

Payment stages and offer requirements

Standard concept-to-playable packs are payable 35% before concept development and 65% after concept selection and before final production. A customer may choose not to proceed after a conforming concept stage without automatically owing the 65%, unless a separate valid commitment says otherwise.

Other services use the expressly accepted payment schedule. The offer sets currency, taxes, disclosed processing costs, art/asset route, prices of extras and dates. Receipt of a payment does not by itself make it non-refundable.

Milestone and cancellation valuation schedule

Every paid offer must include a mutually accepted Milestone & Cancellation Valuation Schedule before production starts. It states:

  • Concept and final-stage values.
  • Individual final-playable or wave allocations summing to the final-stage price.
  • The evidence-based method to assess partly completed work.
  • Separately approved, genuinely non-recoverable third-party commitments.

Revisions and extras are individually priced or shown as included. A schedule cannot be introduced retroactively at cancellation.

Kickoff

A stage starts only after the parties validly accept the offer and applicable terms, the due stage payment clears, essential prerequisites and acceptance criteria are complete, and millrace confirms kickoff.

For standard work millrace offers a kickoff within seven calendar days after these requirements are met unless a later slot was accepted before payment. A slot that becomes unavailable for a reason on millrace’s side will be promptly rescheduled by agreement or dealt with through applicable cancellation and refund rights; payment never reserves an indefinite future slot.

Production clocks and permitted pauses

The published targets and thresholds below count elapsed production hours, not staff working hours. Weekends and overnight periods ordinarily count. Where identified and notified with the reason, start and end time, only these matters pause the affected clock:

  • Needed customer feedback or approval, or a stage payment that is due but not yet received.
  • Missing essential customer-controlled assets, permissions, account access or external dependencies within customer control.
  • A mutually approved scope change requiring rescheduling.
  • Official public-holiday periods in Turkey, as announced by the Turkish government (half-day holidays from 13:00 Turkey time).
  • An exceptional external event genuinely outside reasonable control that actually prevents performance.

A pause ends when its specific blocker has been resolved and production can resume. millrace’s ordinary workload, overbooking, routine staffing problems, internal QA, ordinary software/tooling problems, expected scope work and correction of its own errors do not pause clocks. Pauses cannot be imposed retroactively to erase an accrued threshold.

Customer review windows and accepted revision work follow the separate Project and Creative Rejection Policy: review by the customer pauses the relevant clock; millrace’s work on an actionable accepted revision is not a customer-controlled pause. A separately accepted change order records the effect of any additional scope on timing.

Standard package schedules

Targets are good-faith planning estimates, not guaranteed delivery dates. The two delay thresholds below are binding for the accepted standard pack if the delay is attributable to millrace, excluding only the documented pauses above. A phase is on time when the relevant conforming agreed batch or final deliverable is provided by the relevant threshold.

The production clock is satisfied by a conforming initial delivery; a later in-scope creative revision has its separately agreed revision period and does not retrospectively reopen an already satisfied production guarantee. A materially defective or nonconforming purported delivery does not stop the production clock merely because a file or link was sent. For multiple finals, each final’s contractual due time is the stated package schedule unless the accepted offer expressly assigns independent deadlines/waves.

Accepted packPhaseNormal targetFirst delay thresholdSecond delay threshold
3 Concepts / 1 FinalConcepts72 hoursover 144 hoursover 216 hours
3 Concepts / 1 FinalFinal(s)48 hoursover 96 hoursover 144 hours
5 Concepts / 3 FinalsConcepts72 hoursover 144 hoursover 216 hours
5 Concepts / 3 FinalsFinal(s)48 hoursover 96 hoursover 144 hours
6 Concepts / 4 FinalsConcepts120 hoursover 240 hoursover 360 hours
6 Concepts / 4 FinalsFinal(s)48 hoursover 96 hoursover 144 hours

The concept clock begins at confirmed concept kickoff. The final-production clock begins at the separately confirmed final kickoff after concept selection and cleared completion balance.

The parties may expressly agree different schedules in the accepted offer for atypical complexity, expanded networks, unique asset needs, other counts or agency waves. They must be disclosed before acceptance, identify affected work and remedies clearly, and never silently replace the above schedule after payment. If there is no accepted standard-pack schedule because the scope is custom, only the specifically negotiated project deadlines and mandatory legal remedies apply; a standard-pack credit is not automatically implied.

Limited contractual delay credits

A qualifying delay attributable to millrace earns a cash refund or invoice credit chosen by the customer:

At the first applicable threshold
10% of the affected allocated value.
At the second threshold
20% of the affected allocated value in total; any first-tier 10% already paid forms part of that 20% and is not added again.

Affected allocated value means: for the concept batch, the contracted 35% concept-stage price; for final production, the offer-allocated price of each final playable or wave that actually exceeds its applicable threshold. When only one of four final playables is late, there is no automatic delay credit on the other three conforming, on-time playables.

The total contractual delay credit on the same affected value cannot exceed 20% of that value, unless the accepted offer explicitly promises more. Different missed deadlines cannot be compounded on the same work to exceed this amount. Credits are calculated using the accepted project currency, excluding taxes that law requires to be treated separately.

Illustration: a $1,000 project with four final playables

  • $350 is for concepts and $650 for four final playables. The offer allocates the finals equally: $162.50 each.
  • Only one final exceeds its first threshold: the credit is $16.25.
  • That final reaches its second threshold: the total credit for it becomes $32.50.
  • All four finals miss the second threshold: total final-stage delay credits are $130, not $650.
  • The entire concept batch exceeds its second threshold: the separate concept-stage delay credit is $70.

These illustrations assume documented delay caused by millrace and no valid qualifying pauses.

A customer may continue performance after receiving a credit, in which case millrace must still complete conforming work, or may seek cancellation and an itemized settlement where the contract or law permits. On valid termination, neither party must perform the terminated, unfinished scope; refund and settlement obligations survive.

Delay credits and other remedies

The delay credits above are contractual. Where our general service terms impose a monetary limit on ordinary business-to-business damages, that limit alone does not extinguish them.

Delay credits are distinct from restitution of unearned payments and mandatory remedies, but amounts compensating the same fee or identical legally established loss are reconciled to avoid double recovery. The credits do not waive claims for defective/non-delivered work or other non-excludable rights. Claims for a credit can be made as described under “Requesting and receiving a refund or credit”, without a requirement to prove actual campaign loss.

Rush production

Rush is available only when capacity is confirmed in writing. The accepted offer identifies the dedicated Rush slot, deliverables, stated deadline, extra premium and qualifying pauses.

If millrace misses that deadline for reasons within its control, the separately charged Rush premium attributable to the late work is refundable. No Rush premium is kept for a failed accelerated service. A standard delay credit becomes due only if its separately applicable standard threshold is also crossed; a premium refund does not mechanically cancel statutory rights. The settlement avoids duplicating reimbursement for an identical charge or loss.

Rush does not reduce customer review windows or automatically accelerate creative revisions.

Cancellation and work performed

Either party’s valid legal or contractual termination rights remain available. Charges are based on the agreed valuation schedule and reasonably evidenced conforming work, not on a retrospective percentage invented after a cancellation. A breach by millrace or mandatory law may require a different valuation or refund.

Before kickoff

Unearned advance payments are refunded, allowing only lawful, separately approved, genuinely non-recoverable expenses supported by evidence where chargeable. There is no undisclosed booking or cancellation fee.

During concepts

Completed conforming individual concepts and objectively documented partial activities are valued against the accepted schedule. Undelivered or nonconforming work is not automatically earned. Any legally required refund, correction or other remedy takes priority.

After conforming concept delivery

The agreed 35% concept fee is generally earned, subject to breach and mandatory rights. Creative dissatisfaction is evaluated under the Rejection Policy. The customer may elect not to fund finals; the 65% is not automatically owed.

During final production

The accepted offer’s price allocations apply by final deliverable or agreed wave. For partially built finals, only objectively verifiable tasks completed before termination may be assessed, using the pre-agreed percentage weights or evidence standard.

An example default allocation — if expressly accepted in the offer — is 15% planning/setup, 45% implementation, 25% network integration and 15% completed packaging/QA for each final’s own allocated price.

A step does not earn its weight if it is not substantially performed or is materially nonconforming; no unrealized profit is hidden inside an unearned step. Shared effort and external commitments cannot be charged a second time on top of the same priced activity. Reasonably evidenced work is assessed in light of the termination cause and applicable law.

After conforming final delivery

There is no automatic change-of-mind refund for otherwise conforming B2B work, and campaign underperformance is not itself a refund reason. Statutory cancellation, defect and other rights are preserved.

Itemized settlement

millrace provides a written, itemized settlement showing amounts paid, stage and deliverable valuations, completion evidence, approved external commitments, qualifying credits, any amounts already refunded, remaining rights to files and licenses, and the final amount owed or refundable. millrace aims to prepare it within five business days after valid termination.

Any previously paid delay credit is taken into account only to prevent duplicate recovery on the identical fee or proven loss, where law permits. Neither party charges twice for the same work.

Inactivity and restart

Inactivity runs from a documented request for an essential action.

Day 0
Request and any justified pause.
Day 14
First reminder.
Day 30
Second reminder and archiving warning.
Day 45
Archive and possible release of the slot.
Day 60
Final notice and, where permitted by agreement and law, initiation of termination or a proposed settlement.

Inactivity by itself never forfeits a payment.

Restarting

Reactivation within 45 days of the original pause is normally accommodated without an administrative fee subject to capacity; an archived slot may need rescheduling. Materially changed platform requirements or scope may need a fresh offer. Once validly terminated and settled, further work requires a new agreement.

Other services, agencies and review duties

Fixing or porting, direct/storyboard/idea work and custom or agency batches require specific accepted milestone values, dates, cancellation rules and Rush terms. Standard 35%/65% stages and the package-specific delay credits do not apply to those services automatically.

Agencies should use individually valued deliverables or delivery waves with acceptance criteria; an issue in one independent wave does not erase conforming value delivered in another unless mandatory law or a material dependency requires otherwise. Any committed-capacity fee must be reasonable and expressly accepted.

The separate Project and Creative Rejection Policy governs the 14/7-day customer-review windows, shared revision-round limits, 45-day complimentary upload/network-assistance period and corrective work. A fault attributable to millrace is not converted into a paid revision merely because a standard free-support window expires.

Requesting and receiving a refund or credit

Write to info@millraceworks.com identifying your project, relevant stage/deliverable and reason.

  • We acknowledge every refund request within 72 hours.
  • We request missing information promptly.
  • We aim to give a reasoned decision within 10 business days after sufficient evidence.
  • We pay an approved refund within a further 10 business days, or any shorter mandatory legal period.

Where a contractual delay credit is objectively due, it is not a discretionary goodwill benefit. Denials or partial decisions include the stage valuation and calculation.

Refunds use an appropriate traceable payment method and the agreed currency; unlawful fees are not charged to consumers. Applicable law prevails over these administrative timeframes.

Mandatory rights

Consumer withdrawal, nonconformity, termination, restitution, intellectual-property, privacy and other mandatory rights are not excluded. No term is an automatic waiver based on silence or delivery status.

Updating this webpage does not retrospectively remove a customer’s accepted rights.